In a move to accelerate city transport growth, the Prime Minister of Thailand, Prayut Chan-o-cha, is scheduled to examine the Pink Line urban rail project‘s ongoing progress tomorrow before it’s set to start its trial operations. This announcement got here from Anucha Burapachaisri, the acting government representative.
This inspection go to is centred on the Pink Line, a large elevated monorail prepare initiative spearheaded by the Mass Transit Authority of Thailand (MRTA). Pay zero , which spans Khae Rai to Min Buri, has been proposed to enhance connectivity within the north of Bangkok and Nonthaburi by intersecting with 5 major public transit traces. With a whopping size of 34.5 kilometres, the Pink Line will house 30 stations once operational.
In phrases of delegation, the prime minister might be joined by Anupong Paojinda, the Interior Minister, Thanakorn Wangboonkongchana, Prime Minister’s Office Minister, and Athirat Rattanaseth, the Deputy Transport Minister. The entourage will meet on the Min Buri station round 1.30pm to hear a comprehensive briefing from the MRTA governor, followed by a visit to the convergence level of the Orange Line. Post this, they will engage in a check run, from Min Buri to Lat Pla Khao station, reported Bangkok Post.
A recap of the development updates revealed that by June of this year, the Pink Line’s build was roughly 96.97% accomplished and the electrical system stood at 97.34% completion, leading to an overall development of ninety seven.15% shared Anucha.
According to a confidential supply from the transport ministry, the Northern Bangkok Monorail Company Limited (NBM) is all set to function the line after being granted the appropriate permission. Initially, the NMB had forecasted that the Pink Line can be commencing trial runs in January, with full services kicking off by June 2024..

42 Responses

Leave a Reply

Your email address will not be published. Required fields are marked *